TEMPLEOGUE COLLEGE
Client: Department of Education
Consultant: Galileo
Duration: 4 months
Contract Type: Mechanical
In 2014 Celsius Mechanical completed the mechanical contract on Templeogue College. This is 2-storey building comprising classrooms, GP hall, libraries, staff rooms, stores and toilets.
The project consisted installation of new weather compensated heating system including gas fired boilers located in the boiler house and radiators throughout the building. The existing water system was upgraded by installing 2 port valves to reduce the water wastage and two new GRP water tanks replacing the existing steel tanks.
The services provided under this contract included water, condensate, heating, gas and BMS.