MenuCall

NATIONAL SPORTS CAMPUS

Client: National Sports Council of Ireland

Consultant:     Tobin Engineers  

Duration:         9 months

Contract Type: Mechanical

 

In 2014 Celsius Mechanical were awarded the mechanical design and build contract for National Sports Campus comprising mixed training zone, running track area, jump area and boxing training zone along with rehab area, changing and shower rooms, toilets, stores, social ecology areas and offices.  

The project consisted installation of air handling unit providing tempered air to duct mounted air conditioning units. Air is cooled or heated to required temperature in these units and then supplied via diffusers to all areas. The return air from the training areas is supplied to changing rooms and then pulled from the shower rooms and toilets through air handling unit to recover the heat via thermal wheel. Heating is providing by fully modulating condensing gas fired boilers feeding underfloor heating system in changing village and social ecology areas. Heating in other areas is provided by air conditioning system. Hot water is supplied but water heater. 

The services provided under this contract included gas, LPHW, water, drainage, ventilation, air conditioning and BMS controls.