MenuCall

HOLY CHILD SPORTS HALL

Client:           Holy Child School

Consultant:   BDP

Duration:      6 months

Contract Type: Mechanical

 
 

In 2014 Celsius Mechanical completed mechanical contract on Holy Child Sports Hall. This is new build building on a green field section of existing site adjoining Holy Child Secondary School and hockey pitch in Killiney. 

The project consisted installation of condensing, fully modulating gas fired boiler feeding radiant panels in sports hall and radiators in other part of building. Sports hall is controlled by temperature sensor sending signal to 2 port motorised valve through BMS. All other rooms are provided with individual temperature controls by means of 2 port motorised valves that are fed from temperature sensors. Hot water is generated by hot water heater. Air from changing rooms and internal toilets is extracted via one central extract fan controlled via PIR sensor through BMS. 

The services provided under this contract included gas, LPHW, water, drainage, ventilation and BMS controls.